DUNCAN AVIATION – PROVO
Completion Date: 2020
Services: Architecture/General Contracting
Area: 57,500 SF
Delivery: Design/Build
About:
The 57,500 SF Paint Hangar facility consists of a Down Draft Paint Bay, a Cross Draft Paint Bay, offices, shops, employee break room, shop support spaces, a paint storage room and a waste treatment room. The project also includes the installation of a regenerative thermal oxidizer (RTO) to control and minimize the pollutants emitted during the painting process. This project was built concurrently with an adjacent maintenance hangar facility on the same campus.