DASSAULT FALCON JET – WILMINGTON

Location: Wilmington, DE

Client: Dassault Falcon Jet

Download: Project Summary

Completion Date: 2004

Services: Architecture/General Contracting

Area: 37,995 SF

Delivery: Design/Build

About:

This Paint Hangar facility is comprised of a state of the art, “dual flow balanced” down draft paint hangar, a sand/strip hangar bay, and a cross-flow priming/striping bay. Centrally located within the foot print of the building is a two story support space including offices, storage rooms, and a break room.