DUNCAN AVIATION – PROVO

Location: Provo, UT

Client: Duncan Aviation

Download: Project Summary

Completion Date: 2020

Services: Architecture/General Contracting

Area: 57,500 SF

Delivery: Design/Build

About:

The 57,500 SF Paint Hangar facility consists of a Down Draft Paint Bay, a Cross Draft Paint Bay, offices, shops, employee break room, shop support spaces, a paint storage room and a waste treatment room. The project also includes the installation of a regenerative thermal oxidizer (RTO) to control and minimize the pollutants emitted during the painting process. This project was built concurrently with an adjacent maintenance hangar facility on the same campus.